Equipments Experience.
Date |
Description |
Q’ty |
Client/ EPC. |
Owner |
|
Sep 13-Dec 13 |
Calculation TAILGAS Vessel |
1 |
--- |
Daneilli |
![]() |
Sep 13-Dec 13 |
Calculation PSA Absorber |
1 |
--- |
Daneilli |
![]() |
Aug 12 |
Design drawing and calculation API 650 Tank for UF Water and Soft water in Pepsi co plant |
2 |
Thai – Shi |
Pepsi Co Thailand |
![]() |
May 12 |
Engineering service for 3 exchangers, Attending technical meeting with client Shell and Tube heat exchangers |
1 |
--- |
STRR Engineering |
![]() |
Mar 12 - Apr 12 |
Engineering service for IRPC/HDE SAN III Project, Mechanical calculation , G/A drawings, Detail drawing, MT & Spare part list |
1 |
--- |
Thai Rotary Engineering Public |
![]() |
Jun 11 |
Shop drawing for Jacket Reactor |
1 |
Slot-Nankai |
KAO |
![]() |
Dec 11 |
Provide shop drawing for heat exchanger |
8 |
Slot-Nankai |
MKK |
![]() |
Mar 11 |
Shop drawing and calculation for API 650 tank |
1 |
ASC |
PTTCH I-1 |
![]() |
Oct 10 |
Shop drawing and calculation for steam receiver |
1 |
CWN |
IRPC |
![]() |
Oct 10 |
Shop drawing for steam storage dia. 5,5 m x 15 m.Long |
1 |
TSHI |
VNT |
![]() |
Sep 10 |
Re-rate Shell and tube exchanger AES type |
1 |
Alliance service |
PTTCH I-1 |
![]() |
Sep 10 |
Shop drawing and calculation of new acetylene reactor |
1 |
Alliance service |
PTTCH I-1 |
![]() |
Jul 10 |
Construction drawing and calculation storage tank dia. 33 m Per EN 14015 |
2 |
Summit/Worley |
Shell Brunei |
![]() |
Jun 10 |
Roof deck replacement drawing tank 62 m dia. |
1 |
Tat-lee |
PTT Sriracha |
![]() |
Mar 10 |
Shop drawing and calculation for exchanger |
2 |
--- |
IRPC |
![]() |
Jan 10 |
Shop drawing and calculation for Shell and tube exchanger |
4 |
MRP |
Siam rice oil |
|
Feb 09 |
Shop drawing and calculation of gas receiver |
1 |
CM land |
PTT Rong Po |
![]() |
Aug 08 |
Shop drawing and mech calculation for shell and tube exchanger |
1 |
Union service |
|
![]() |
Aug 08 |
Shop drawing for vertical and horizontal drums |
9 |
Unimit |
Thai MMA |
![]() |
Sep 07 |
Shop drawing and mech calculation of shell and tube Exchanger |
3 |
STRR |
PTTCH |
![]() |
Feb 07 |
Shop drawing for API tank |
14 |
Getabec/ Worley Parson |
TOL |
|
Oct 06 |
Shop drawing for reactor |
15 |
Sutee/ Uhde |
TOL |
|
Sep 06 |
Shop drawing for reactor, pressure vessel |
25 |
Getabec / Uhde |
TOL |
|
Jun 06 |
Shop drawing for vertical and horizontal vessel |
22 |
STRR / Bechtel |
Thai Lube |
![]() |
May 06 |
Shop drawing and mech. calculation |
20 |
Slot-Nankai / FW |
Esso |
![]() |