Piping Experience.

 

Date

Description

Q’ty

Contractor

Owner

Sep 13-Dec 13

New Air compressor for  AIP & AII

1

---

IRPC

Jun 13-Dec 13

Update P & ID PTT Gas

1

---

PTT

Jun 13-Aug 13

Vam recovery purification unit. Process engineering design package.

1

---

TPIPL

Mar 13-Jun 13

Ha1e catalyst commercialization

1

---

IRPC

Jan 13- Aug 13

Nano chemical and additive ISBL, OSBL

1

---

IRPC

Jan 13- Aug 13

Utilities lines for BIG  Nitrogen plant ISBL, OSBL

1

---

IRPC

Nov 12- May 13

Engineering service for plant revamp

1

---

Thai Taffeta

Sep 12

Piping engineering for pipe class D7a

1

---

T.S. Engineering

Aug 12

Engineering  design package for PP Plant improvements Project

1

---

Chaiwatthana

Sep 12

Piping engineering service Tie in Line C9, C33, C37, C27, C23, C24 for BV OSBL Project

1

---

PTT ME

July 12

Spare C-3 Hydrogenation reactor

1

---

PTT ME

Oct 11 - Jan 12

Piping engineering service PTTCH-PTTRAR off-gas synergy pipe line project

1

---

PTT ME

Oct 11 - Dec 11

Piping engineering service green abs expansion project (ABS VI)

1

---

PTT ME

Nov 11-Dec 11

Provide P&ID, plot plan , GA , Isometric, BOM of utility service such as air, cooling water, CO2

Etc. for machine testing

1

TCM/Jacobs

Western Digital

Oct 11-Dec 11

Provide tie in detail, GA, Isometric, BOM for ABS plant VI

1

PTTME

IRPC

Jul 11-Oct 11

Provide GA, Isometric, BOM

for line off gas synergy

1

PTTME

PTTCH I-4

Jun 11

Provide GA , Isometric, BOM

Line 4”, 6” for new condensate drum

1

The Companion

BCP

Mar 11-May 11

Provide GA , Isometric, BOM for KAO industry new expansion

1

Slot-Nankai

KAO Ind.

Jan 11-Dec 11

Provide GA, Isometric, BOM, Pipe stress for various jobs such as…

Condensate recovery, high speed diesel, new cooling tower, Gasohol sell out, Ammonia line to port.

1 lot

NPS Eng

IRPC

Oct 10

Provide GA and Isometric drawing, BOM, Pipe stress acetylene unit

1

Alliance service

PTTCH I-1

Jul 10-Dec 10

Provide GA and Isometric drawing, BOM, Pipe stress

1 lot

NPS Eng

IRPC

Jan 10-Dec 10

Provide GA and Isometric drawing, BOM, Pipe stress

1 lot

---

Thai ABS

Jan 10-Dec 10

Provide GA and Isometric drawing, BOM, Pipe stress

1 lot

---

IRPC

Jan 10

Provide GA and Isometric for Sour water

1

The companion

BCP

Dec 09

Provide GA and Isometric for Replace propylene 4”

1

---

PTTCH I-1

Jul 09

Provide isometric drawing of truck loading expansion

1 lot

CM land

PTT Rong Po

May 09

Provide GA and Isometric for LPG cracked MRU reactor

1

The companion

BCP

Mar 09

Provide GA and Isometric for MRU fuel gas

1

The companion

BCP

Sep 09- Dec 09

Provide GA and Isometric drawing, BOM, Pipe stress

1 lot

---

IRPC

Sep 09-Dec 09

Provide GA and Isometric drawing, BOM, Pipe stress

1 lot

---

Thai ABS

Oct 08

Pipe stress analysis

1

The companion

LCB Power

 

Sep 08

Isometric drawing, pipe stress and hydraulic calculation for SM line

1

The companion

DOW

Sep07-Sep 08

Provide GA and Isometric drawing, BOM, Pipe stress

1 lot

---

IRPC

Sep07- Sep 08

Provide GA and Isometric drawing, BOM, Pipe stress

1 lot

---

Thai ABS