Piping Experience.
|
Date |
Description |
Q’ty |
Contractor |
Owner |
|
|
Sep 13-Dec 13 |
New Air compressor for AIP & AII |
1 |
--- |
IRPC |
![]() |
|
Jun 13-Dec 13 |
Update P & ID PTT Gas |
1 |
--- |
PTT |
![]() |
|
Jun 13-Aug 13 |
Vam recovery purification unit. Process engineering design package. |
1 |
--- |
TPIPL |
![]() |
|
Mar 13-Jun 13 |
Ha1e catalyst commercialization |
1 |
--- |
IRPC |
![]() |
|
Jan 13- Aug 13 |
Nano chemical and additive ISBL, OSBL |
1 |
--- |
IRPC |
![]() |
|
Jan 13- Aug 13 |
Utilities lines for BIG Nitrogen plant ISBL, OSBL |
1 |
--- |
IRPC |
![]() |
|
Nov 12- May 13 |
Engineering service for plant revamp |
1 |
--- |
Thai Taffeta |
![]() |
|
Sep 12 |
Piping engineering for pipe class D7a |
1 |
--- |
T.S. Engineering |
![]() |
|
Aug 12 |
Engineering design package for PP Plant improvements Project |
1 |
--- |
Chaiwatthana |
|
|
Sep 12 |
Piping engineering service Tie in Line C9, C33, C37, C27, C23, C24 for BV OSBL Project |
1 |
--- |
PTT ME |
![]() |
|
July 12 |
Spare C-3 Hydrogenation reactor |
1 |
--- |
PTT ME |
![]() |
|
Oct 11 - Jan 12 |
Piping engineering service PTTCH-PTTRAR off-gas synergy pipe line project |
1 |
--- |
PTT ME |
![]() |
|
Oct 11 - Dec 11 |
Piping engineering service green abs expansion project (ABS VI) |
1 |
--- |
PTT ME |
![]() |
|
Nov 11-Dec 11 |
Provide P&ID, plot plan , GA , Isometric, BOM of utility service such as air, cooling water, CO2 Etc. for machine testing |
1 |
TCM/Jacobs |
Western Digital |
![]() |
|
Oct 11-Dec 11 |
Provide tie in detail, GA, Isometric, BOM for ABS plant VI |
1 |
PTTME |
IRPC |
![]() |
|
Jul 11-Oct 11 |
Provide GA, Isometric, BOM for line off gas synergy |
1 |
PTTME |
PTTCH I-4 |
![]() |
|
Jun 11 |
Provide GA , Isometric, BOM Line 4”, 6” for new condensate drum |
1 |
The Companion |
BCP |
![]() |
|
Mar 11-May 11 |
Provide GA , Isometric, BOM for KAO industry new expansion |
1 |
Slot-Nankai |
KAO Ind. |
![]() |
|
Jan 11-Dec 11 |
Provide GA, Isometric, BOM, Pipe stress for various jobs such as… Condensate recovery, high speed diesel, new cooling tower, Gasohol sell out, Ammonia line to port. |
1 lot |
NPS Eng |
IRPC |
![]() |
|
Oct 10 |
Provide GA and Isometric drawing, BOM, Pipe stress acetylene unit |
1 |
Alliance service |
PTTCH I-1 |
![]() |
|
Jul 10-Dec 10 |
Provide GA and Isometric drawing, BOM, Pipe stress |
1 lot |
NPS Eng |
IRPC |
![]() |
|
Jan 10-Dec 10 |
Provide GA and Isometric drawing, BOM, Pipe stress |
1 lot |
--- |
Thai ABS |
![]() |
|
Jan 10-Dec 10 |
Provide GA and Isometric drawing, BOM, Pipe stress |
1 lot |
--- |
IRPC |
![]() |
|
Jan 10 |
Provide GA and Isometric for Sour water |
1 |
The companion |
BCP |
![]() |
|
Dec 09 |
Provide GA and Isometric for Replace propylene 4” |
1 |
--- |
PTTCH I-1 |
![]() |
|
Jul 09 |
Provide isometric drawing of truck loading expansion |
1 lot |
CM land |
PTT Rong Po |
![]() |
|
May 09 |
Provide GA and Isometric for LPG cracked MRU reactor |
1 |
The companion |
BCP |
![]() |
|
Mar 09 |
Provide GA and Isometric for MRU fuel gas |
1 |
The companion |
BCP |
![]() |
|
Sep 09- Dec 09 |
Provide GA and Isometric drawing, BOM, Pipe stress |
1 lot |
--- |
IRPC |
![]() |
|
Sep 09-Dec 09 |
Provide GA and Isometric drawing, BOM, Pipe stress |
1 lot |
--- |
Thai ABS |
![]() |
|
Oct 08 |
Pipe stress analysis |
1 |
The companion |
LCB Power |
|
|
Sep 08 |
Isometric drawing, pipe stress and hydraulic calculation for SM line |
1 |
The companion |
DOW |
![]() |
|
Sep07-Sep 08 |
Provide GA and Isometric drawing, BOM, Pipe stress |
1 lot |
--- |
IRPC |
![]() |
|
Sep07- Sep 08 |
Provide GA and Isometric drawing, BOM, Pipe stress |
1 lot |
--- |
Thai ABS |
![]() |